We have over 70% of the hardware for our liquid propellant motor finished.
Parts shown from left to right: 1/ Head dome Nitrous Oxide tank 2/ Bottom dome/ injector plate 3/ Nozzle retainer/ aft boat tail
Parts shown from left to right: 1/ Head dome Nitrous Oxide tank 2/ Bottom dome/ injector plate 3/ Nozzle retainer/ aft boat tail
Close up of injector face showing press-fit pneumatic fittings used for propellant loading as per U/C valve concept.
We will be completing the motor for static testing & qualification on the 12th of July 2007, watch this space for video footage soon after.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment